Rutino Tunnel Widening
Italy
1957 | 1957
The widening of the Battipaglia - Reggio Calabria Railway Line has required the construction of a second single track tunnel parallel to the already existing Rutino tunnel.
The second tunnel was built at 17m distance from the other and with a total length of 2030ml. The stretch connects the Rutino Station to the Torchiara Station from km35+544 to km37+720