Supply, Construction and Operation of the Hydraulic Project Los Negros II

Costa Rica

The Los Negros II hydroelectric plant is immersed in the Costa Rican rainforest and generates up to 28MW thanks to the Negros and Jalapiedras rivers and will serve more than 23,000 families. The construction includes a 2,3km tunnel built through traditional excavation methods.

Previous Next